POM assgn
 True/False
  Question 
Site selection should also take into account topography and soil structure of the land.
  Correct Answer 
True
  Your Answer 
True
 Multiple Choice Single Answer
  Question 
Which manufacturing method is ideal for the use of air gauges as inspection device?
  Correct Answer 
Mass
  Your Answer 
Batch
 True/False
  Question 
Kanban system is essentially a computer based system for production scheduling and control
  Correct Answer 
False
  Your Answer 
False
 Multiple Choice Multiple Answer
  Question 
Which are three different bases to establish an activity time?
  Correct Answer 
Past experience , Judgement , Historical data
  Your Answer 
Past experience , Judgement , Historical data
 True/False
  Question 
Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop.
  Correct Answer 
False
  Your Answer 
False
 Multiple Choice Single Answer
  Question 
Which of the following policies is advisable in case of low product variety and large volumes?
  Correct Answer 
Low Skilled Labour & Special Purpose Machines
  Your Answer 
Semiskilled Labour & General Purpose Machines
 Select The Blank
  Question 
Capacity decisions have a direct influence on performance of production system in respect of ________
  Correct Answer 
Delivery performance
  Your Answer 
Delivery performance
 True/False
  Question 
In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed.
  Correct Answer 
True
  Your Answer 
True
 Select The Blank
  Question 
The ________ pertain to the climatic conditions which the component , product or material should withstand.
  Correct Answer 
Environmental specifications
  Your Answer 
Environmental specifications
 Select The Blank
  Question 
The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company.
  Correct Answer 
Inspection order
  Your Answer 
Job card
 Match The Following
Question
Correct Answer
Your Answer
Crash cost of an activity
Cc
Cc
Normal time of an activity
Tn
Cn
Crash time of activity
Tc
Tc
Normal cost of an activity
Cn
Tn
 True/False
  Question 
Lubrication survey should never be done for a new machine.
  Correct Answer 
False
  Your Answer 
False
 Multiple Choice Single Answer
  Question 
A good plant layout helps in
  Correct Answer 
Reducing handling costs
  Your Answer 
Reducing handling costs
 Multiple Choice Single Answer
  Question 
Out of two basic criteria for the selection of a manufacturing method, one is, it must be able to meet the specifications of final product and the other is, it must be
  Correct Answer 
Cost effective method
  Your Answer 
Cost effective method
 Multiple Choice Multiple Answer
  Question 
Which of the following is a part of preparing manufacturing order set as a primary function of dispatching?
  Correct Answer 
Operational layouts , Move orders , Pre-filled stores issue orders
  Your Answer 
Operational layouts , Move orders , Pre-filled stores issue orders
 Select The Blank
  Question 
A ________ is another form of subcontracting.
  Correct Answer 
Hiring capacity
  Your Answer 
Hiring capacity
 Multiple Choice Multiple Answer
  Question 
Which are the major types of defects?
  Correct Answer 
Minor , Major , Critical
  Your Answer 
Minor , Critical , General
 Multiple Choice Single Answer
  Question 
Which kind of labour force is required in case of Jobbing Production?
  Correct Answer 
Highly Skilled
  Your Answer 
Highly Skilled
 Multiple Choice Multiple Answer
  Question 
Which are the sources of information to update the progress card daily?
  Correct Answer 
Detachable ticket , Daily production report , Job Card
  Your Answer 
Detachable ticket , Daily production report , Job Card
 True/False
  Question 
In case of forward pass computation, the earliest event time of the first event is zero.
  Correct Answer 
True
  Your Answer 
True
 Multiple Choice Multiple Answer
  Question 
Which are the distinct functions of scientific quality control?
  Correct Answer 
Acceptance function , Preventive function , Assurance function
  Your Answer 
Acceptance function , Preventive function , Assurance function
 Multiple Choice Multiple Answer
  Question 
Which of the following are examples of specifications?
  Correct Answer 
Commercial standards , Assembly and testing instructions , Bill of material
  Your Answer 
Production schedule , Commercial standards , Bill of material
 Multiple Choice Single Answer
  Question 
Technique which can help an organization to reduce inventory is called
  Correct Answer 
MRP
  Your Answer 
MRP
 Multiple Choice Single Answer
  Question 
In case of Batch Production which kind of labour is expected?
  Correct Answer 
Skilled in one specific Manufacturing Process
  Your Answer 
Semiskilled
 Multiple Choice Multiple Answer
  Question 
Major contributors in the development of Control Charts, Sampling plan are
  Correct Answer 
F H Dodge , H G Roming , Walter Schewhart
  Your Answer 
F H Dodge , H G Roming , Walter Schewhart
 Multiple Choice Single Answer
  Question 
What is represented by an arrow in a network?
  Correct Answer 
Activity
  Your Answer 
Event
 True/False
  Question 
Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are scheduled.
  Correct Answer 
False
  Your Answer 
True
 Multiple Choice Single Answer
  Question 
Which method of critical path determination begins with the end event and moves backward to the start event of the project network?
  Correct Answer 
Backward pass computation
  Your Answer 
Backward pass computation
 True/False
  Question 
Operation process charts though indicates the sequence of events but do not show movements.
  Correct Answer 
True
  Your Answer 
True
 Multiple Choice Single Answer
  Question 
Which kind of relationship exists between those activities which can be carried out simultaneously and both activities require definite time to finish?
  Correct Answer 
Concurrent activities
  Your Answer 
Concurrent activities
 True/False
  Question 
One major difference between CPM and PERT is the former's adaptability for the projects where high degree of uncertainty prevails and activity times during performance are expected to vary considerably for certain activities.
  Correct Answer 
False
  Your Answer 
False
 Multiple Choice Multiple Answer
  Question 
Following are some of the Principles of Management advocated by F W Taylor
  Correct Answer 
Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen
  Your Answer 
Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen
 Multiple Choice Single Answer
  Question 
Inadequate production capacity ultimately leads to
  Correct Answer 
Poor Customer Service
  Your Answer 
Poor Machine Utilization
 Multiple Choice Multiple Answer
  Question 
Which of the following schedules are recommended to prepare and follow as a part of preventive maintenance system?
  Correct Answer 
Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule
  Your Answer 
Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule
 Multiple Choice Single Answer
  Question 
What is the reason of fluctuations, if the control chart evaluates that the process is in a state of statistical control?
  Correct Answer 
Random variability
  Your Answer 
Random variability
 True/False
  Question 
Even in a small set up wherein maintenance of a machine is looked after by a mechanic cum worker, he should report directly to the person responsible for the manufacturing operations.
  Correct Answer 
True
  Your Answer 
True
 Multiple Choice Single Answer
  Question 
What do you mean by the chart on which the major activities and entry points of materials are recorded to have graphic view of operations and inspections involved in the process?
  Correct Answer 
Operation process chart
  Your Answer 
Operation process chart
 Multiple Choice Single Answer
  Question 
Plant Layout decisions are considered to be
  Correct Answer 
Strategic
  Your Answer 
Strategic
 Multiple Choice Multiple Answer
  Question 
What are the uses of the instruction manual provided by the manufacturer of a machine?
  Correct Answer 
It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication
  Your Answer 
It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication
 Multiple Choice Single Answer
  Question 
When should operator or supervisor is supposed to sign the perforated route sheet?
  Correct Answer 
After completion of operation
  Your Answer 
After completion of operation
 Multiple Choice Multiple Answer
  Question 
Which of the following situations demand that the human consideration should be given preference over other considerations?
  Correct Answer 
Inconsistent earnings where the earnings are tied to output , Poor morale evidenced by petty or trivial complaints , Repeated cases of accidents and health hazards
  Your Answer 
Excessive rejections , Poor morale evidenced by petty or trivial complaints , Repeated cases of accidents and health hazards
 True/False
  Question 
A network can have more than one starting event but completion event must be only one.
  Correct Answer 
False
  Your Answer 
True
 Multiple Choice Single Answer
  Question 
Which is the ideal place to write a description of an activity in a network?
  Correct Answer 
Above the arrow
  Your Answer 
Above the arrow
 Multiple Choice Multiple Answer
  Question 
Which features should be covered by the specifications of materials while defining the qualitative requirement?
  Correct Answer 
Material composition , Dimensions , Any heat treatment if required
  Your Answer 
Material composition , Dimensions , Any heat treatment if required
 Match The Following
Question
Correct Answer
Your Answer
When to inspect
Stages of inspection
Stages of inspection
What to inspect
Specification
Specification
How to inspect
Inspection devices
Inspection devices
How much to inspect
Sampling or cent percent inspection
Sampling or cent percent inspection
 Multiple Choice Multiple Answer
  Question 
How the concept of float is helpful to planners?
  Correct Answer 
To decide priorities in allocation of resources , To minimize the requirement of resources , To prevent peaks and valleys in requirement of resources
  Your Answer 
To decide priorities in allocation of resources , To minimize the requirement of resources , To prevent peaks and valleys in requirement of resources